Art Deco styled image representing continuous integration, featuring a grand train station with sleek, futuristic trains and a sophisticated control center, emphasizing the seamless flow of integration processes.

I wrote a post over on synaptiq.ai’s site where I shared some lessons about how we’re keeping some of our costs down. It’s great for us and our clients as across the board we’re continuing to find cost savings without reducing our ability to leverage our CI.

  1. Cancel non-critical runs
  2. Use tags to hold back non-critical runs
  3. Use bigger runners to reduce overall billed time
  4. Balance human labor vs computer labor
  5. Buy a Raspberry Pi and use it as a runner (or two)


You can read the full post over there if you’re curious.

main image from this post generated by DALL•E 3